skip to Main Content

Power Flushing at the O2 arena

Power Flushing: The expert power flushing team at Dantek recently deployed their latest Kamco power flushing pump at the renowned O2 arena in London. This cutting-edge pump is specifically designed for pre-commission flushing of smaller circuits, filling a crucial need where traditional system pumps may not be available. Currently engaged in pre-commission cleaning of heat and chilled circuits for air handling units serving new retail units at the O2 arena, Dantek is committed to delivering exceptional service quality.

According to Steve Sims, Mechanical Supervisor at Dantek, “The new Flushing unit represents a significant upgrade over its predecessor. With the addition of wheels, maneuvering the unit has become much easier. Additionally, the new connections manifold enhances safety, significantly reducing the risk of spillages.” This investment in advanced equipment reflects Dantek’s dedication to maintaining and enhancing their world-class service delivery standards.

Continually investing in state-of-the-art equipment, Dantek ensures they stay at the forefront of their field, providing unmatched solutions to their clients. For professional power flushing services and more, call Dantek now at 01454 417 920.

Email sales@dantek.co.uk

Back To Top